Combined Cycle Power Plant Jibs

Urgently require the below Energy experts for Gas Combined Cycle Power Plant in Bangladesh.
Experience with GE systems Mark Vie (Highly Advantageous).
AIl are temporary contracts (260 hours p/month )

  • PTW Engineer (Permit to Work) – x2
  • Chemist Commissioning Engineer – x3
  • Electrical Commissioning Engineer – x4
  • ICS Commissioning Engineer (EWSC, HRSG) – x4
  • HRSG Commissioning Engineer
  • Lead Operation Supervisor
  • Operator – x4
  • Mechanical Commissioning Engineer – x3
  • Commissioning Manager (Deputy) – x2

If you are available and interested in joining, send your CV to sparmar@janikin.com to be considered.

Leave a Reply